The Sportsman’s Bridge project on MT Highway 82, that crosses the Flathead River, continues to make headway. While recently traveling in the vicinity, you may have seen crews drilling on the project site. Engineers were conducting additional geotechnical survey work, gathering information about the physical characteristics of the soil and rock within the project. The project team is also finishing up the utility survey, and work continues to finalize road and bridge designs.
We would love to meet you and share more about our planning efforts. Please join us on December 11 from 11 a.m. to 2 p.m. at Sliter’s Park, 291 Bridge Street, Bigfork, to “Build Bridges in the Community” this holiday season!
Pick up a bridge-themed goodie bag, learn more about the Sportsman’s Bridge and Bridge Street Bridge projects, and donate a non-perishable food item to the Bigfork Food Bank. A donation is not required to receive a goodie bag.
Questions or looking for additional details? Please visit the Sportsman’s Bridge webpage at: https://www.mdt.mt.gov/pubinvolve/flathead/. You can also call the project hotline at 406-207-4484, operating Monday through Friday from 9 a.m. to 5 p.m., or email me at sloane@bigskypublicrelations.com